KPIs
Perfect Operation%
The percentage of operations that are completed without any delay or issue. The percentage can be calculated using this formula: (Perfect Ops / Total Ops) *100
Labor Cost Variance
The difference between actual and planned labor cost. The difference in labor cost can be calculated using this formula: Actual Labor - Planned Labor
Machine Overhead Cost Variance
The difference in machine overhead cost. The difference in cost can be calculated using this formula: Actual Machine OH - Planned Machine OH
Labor Overhead Cost Variance
The difference in labor overhead cost.
The difference in cost can be calculated using this formula: Actual Labor OH - Planned Labor OH
Machine Utilization%
The percentage of available machine capacity that is used during a specific period. The percentage of capacity can be calculated using this formula: (Actual Run Time / Available Time) *100
Labour Efficiency%
The difference between actual labor hours and standard labor hours for a defined operation or period. The difference in hours can be calculated using this formula: (Standard Hours / Actual Hours) *100