Job Operations Details Dashboard

Use this dashboard to create a job operation reporting model for SyteLine integrated with Birst. The model provides operation-level visibility across manufacturing jobs. The model also supports monitoring of work centers, operation timelines, planned hours compared to actual hours and cost components.

These are the filters in this dashboard:

  • Site
  • Entity
  • Year
  • Year/Month
  • Warehouse
  • Manufacturing Type
  • Job Number
  • Operation Number
  • Job Order Status
  • Work Center
  • Item

These columns are displayed in this dashboard:

Site
The location where the job is executed.
Job
The unique job identifier for the production order.
Suffix
The sub-level level detail of the job.
Job Date
The creation date of the job.
Item
The product or component associated with the job.
Operation
The operation number within the job where the material is used.
Order Status
The status of the job order.
Work Center
The work centre where operation is performed.
Work Center Description
The description of the work centre.
Work Center Outside
Indicates if the work centre is external or outsourced.
Start Date
The date on which operation is started.
End Date
The date by which operation is completed.
Planned Setup Hours
The hours planned for setup of the operation.
Planned Labor Run Hours
The number of hours estimated during which labor is required for the operation.
Planned Machine Run Hours
The number of hours estimated during which machine is required for the operation.
Planned Setup Cost
The estimated cost for setup of the operation.
Planned Labor Cost
The estimated labor cost required for the operation.
Planned Labor Fixed Overhead Cost
The estimated fixed labor cost required for the operation.
Planned Labor Variable Overhead Cost
The estimated variable labor cost required for the operation.
Planned Machine Fixed Overhead Cost
The estimated fixed machine cost required for the operation.
Planned Machine Variable Overhead Cost
The estimated variable machine cost required for the operation.
Actual Machine Run Hours
The actual machine run hours.
Actual Labor Run Hours
The actual labor run hours.
Actual Setup Hours
The actual number of hours for setting up the operation.
Actual Setup Cost
The actual cost for setting up the operation.
Actual Labor Cost
The actual labor cost for the operation.
Actual Labor Fixed Overhead Cost
The actual fixed overhead labor cost.
Actual Labor Variable Overhead Cost
The actual variable overhead labor cost.
Actual Machine Fixed Overhead Cost
The actual fixed overhead machine cost.
Actual Machine Variable Overhead Cost
The actual variable overhead machine cost.