Job Operations Details Dashboard
Use this dashboard to create a job operation reporting model for SyteLine integrated with Birst. The model provides operation-level visibility across manufacturing jobs. The model also supports monitoring of work centers, operation timelines, planned hours compared to actual hours and cost components.
These are the filters in this dashboard:
- Site
- Entity
- Year
- Year/Month
- Warehouse
- Manufacturing Type
- Job Number
- Operation Number
- Job Order Status
- Work Center
- Item
These columns are displayed in this dashboard:
- Site
- The location where the job is executed.
- Job
- The unique job identifier for the production order.
- Suffix
- The sub-level level detail of the job.
- Job Date
- The creation date of the job.
- Item
- The product or component associated with the job.
- Operation
- The operation number within the job where the material is used.
- Order Status
- The status of the job order.
- Work Center
- The work centre where operation is performed.
- Work Center Description
- The description of the work centre.
- Work Center Outside
- Indicates if the work centre is external or outsourced.
- Start Date
- The date on which operation is started.
- End Date
- The date by which operation is completed.
- Planned Setup Hours
- The hours planned for setup of the operation.
- Planned Labor Run Hours
- The number of hours estimated during which labor is required for the operation.
- Planned Machine Run Hours
- The number of hours estimated during which machine is required for the operation.
- Planned Setup Cost
- The estimated cost for setup of the operation.
- Planned Labor Cost
- The estimated labor cost required for the operation.
- Planned Labor Fixed Overhead Cost
- The estimated fixed labor cost required for the operation.
- Planned Labor Variable Overhead Cost
- The estimated variable labor cost required for the operation.
- Planned Machine Fixed Overhead Cost
- The estimated fixed machine cost required for the operation.
- Planned Machine Variable Overhead Cost
- The estimated variable machine cost required for the operation.
- Actual Machine Run Hours
- The actual machine run hours.
- Actual Labor Run Hours
- The actual labor run hours.
- Actual Setup Hours
- The actual number of hours for setting up the operation.
- Actual Setup Cost
- The actual cost for setting up the operation.
- Actual Labor Cost
- The actual labor cost for the operation.
- Actual Labor Fixed Overhead Cost
- The actual fixed overhead labor cost.
- Actual Labor Variable Overhead Cost
- The actual variable overhead labor cost.
- Actual Machine Fixed Overhead Cost
- The actual fixed overhead machine cost.
- Actual Machine Variable Overhead Cost
- The actual variable overhead machine cost.