Configuring an Estimate Line
To configure an estimate line, do the following:
After processing, the system updates the Estimate Lines form with the configuration information.
Note:  
		          
 
	     - If Auto Job Generation is set to Always for this item on the Items form, General tab, a cross-reference job is automatically created. If Auto Job Generation is set to Prompt, the system asks if you want to create a cross-reference job. 
- Rules can be defined that place an 
				Infor CPQ
				configuration on hold if, for example, an option in the configuration requires
				approval. When the original user completes the configuration, the 
				 button for
				the line is set to 
				, and the
				
				Config Hold field is
				selected. When a configuration is approved, you can either reconfigure the line
				to remove the hold in 
				Infor CPQ,
				or you can select the 
				 menu option in 
				SyteLine.
				The button label is updated to 
				 and
				the 
				Config Hold field is
				cleared. 
				The configuration hold extends to any jobs that are sourced from the estimate line. Those jobs cannot be released until the hold is removed.