Plan Cost

Enter the price planned to pay for the item on a per item basis. The Plan Cost is set to the break quantity values plus duty, brokerage, freight, insurance, and local freight from the vendor contract, if it exists. If you leave this field blank, the value from the Current Unit Cost field on the Items form is used. This field is used to calculate the cost-to-plan ratio on the vendor contract