APS
Advanced Planning System, which generates real-time projections
of when you can complete orders by comparing all demands (such as customer
orders) against a long-term plan. The system views the current status of
inventory levels, forecasts, job schedules, PO due dates, customer orders, etc.
and creates planned orders accordingly to satisfy the demands. You then "firm"
the planned orders into purchase orders, purchase requisitions, job orders,
production schedules, or transfer orders.
Asynchronous replication
Another term sometimes used for non-transactional
replication.
ATP
Available to Promise function of APS.
BOD
Business Object Document, an XML document standard
defined by Open Applications Group Integration Specifications (OAGIS). This
type of document is used when interfacing with many other
Infor
applications.
BOM
Bill of Material, which is a listing of all the
subassemblies, intermediates, parts, and raw materials that go into a parent
assembly showing the quantity of each required to make an assembly.
Configuration server
A framework component that dynamically gives the client a URL to use for its session, drawing on a pool of servers configured by the system administrator.
CPM
Infor performance
management solution providing a closed loop between strategy, planning,
budgeting, financial reporting and analysis. CPM interfaces with
SyteLine and also
with
Infor financial
management solutions.
CPQ
Product configuration application that interfaces
with
SyteLine. Formerly
known as BuyDesign or PCM.
CTP
Capable to Promise function of APS
Data collection
Collection of data through handheld devices or
barcode readers.
EAM
Infor enterprise asset
management application that interfaces with
SyteLine.
EDI
Electronic Data Interchange, which allows companies
to exchange transaction data through data files in an ANSI standard format.
SyteLine is
integrated with an EDI translator.
SyteLine imports
inbound transactions from the translator and exports outbound transactions to
the translator.
Entity
A level of business operation with a complete set of financial
statements, its own defined currency code and rates, and its own chart of accounts and
accounting periods. An entity does not allow for business activity aside from period, chart,
and currency maintenance and the reporting of its consolidated ledger and budgets. See
Entities.
FOB
Free On Board. The site designated as the FOB point
controls much of the
SyteLine costing
functionality. In the Transfer Order system, you can identify the FOB point as
either the Ship Site or the Receive Site. You must specify the FOB point for
all inter-company movements.
Form
In the SyteLine user interface, the equivalent of a screen or a window.
Intranet
In
SyteLine, represents
a logical grouping of sites in your enterprise. An intranet may represent a
grouping of
SyteLine sites that
exist together on a high-speed network, and for which you want common
administration. (Common administration can include replication, or creation of
master sites.) An intranet may also represent an external non-SyteLine system, allowing you
to set up replication rules between
SyteLine sites and
external systems.
Intranet licensing
Optional feature where licensing for all sites on an
intranet is maintained in and controlled by the master site for the intranet.
Landed cost
Includes freight, duty, brokerage, insurance, and
local freight on purchase orders, transfer orders, or goods receiving notes.
License module
Tracks user access to certain specified functionality within
SyteLine, for auditing purposes. You purchase specific
license modules based on your company's needs.
For
example, if your company is planning to use APS, you would purchase the
AdvancePlanningScheduling license module.
Lot-tracked item
Item that is marked as being in a specific lot, which
is a quantity produced together and sharing the same production costs and
resulting specifications.
Master site
SyteLine site that controls
some data for all other sites on an intranet. For example, master sites are
used with the Multi-Site Shared Tables feature.
MRP
Material Requirements Planning, which plans
requirements in order by the lowest level in which the item appears in a bill
of material. That is, it plans all end items first, then all items at the next
level, and so on, backward planning each requirement from the requirement's
needed date to the item's lead time, batching together requirements needed at
the same period of time.
Multi-site table
A database table that includes a site_ref column.
Records for various sites are stored in the table, and the value of the
site_ref column determines which site the record belongs in.
Non-transactional replication
Uses inbound/outbound queues and XML documents to
replicate content (data) or to pass application calls (RPCs). Non-transactional
replication can occur at any of these intervals: Immediate (which means updates
go directly into the replication queue), or at a set number of minutes, hours,
or days. Once the data is in the queue, it will be processed by the Replication
service when the specified time interval has elapsed.
PLM
Infor product lifecycle
management application that interfaces with
SyteLine
PortalSiteGroup data source
The multiplex data source that includes all
SyteLine sites that
are included in the portal group of sites.
PrimarySite data source
For Customer Portal and Vendor Portal, the data
source that points to a site in the portal site group. This site is the default
data source, where all items and item categories, and certain other data, are
maintained.
Pro forma invoice
A document that verifies the value of goods, when the
goods cross borders. The value of goods is in the from-warehouse's or the
from-site's domestic currency. Although pro forma invoices are typically used
for international shipping transactions, you can also use them for domestic
shipping transactions if desired.
Pull transaction
Transaction that moves or transfers material from
Site B to Site A.
For example, Site A moves material from Site B. Site A is considered
the To Site and Site B is considered the From Site. The quantity will be moved
from Site B to Site A. The quantity comes from Site B to Site A. The
transaction uses the cost/price of Site B.
Push transaction
Transaction that moves or transfers material from
Site A to Site B.
For example, Site A moves material to Site B. Site A is considered the
From Site and Site B is considered the To Site. The quantity will be moved from
Site A to Site B. The quantity comes from the From Site. The transaction uses
the cost/price of Site A.
Replication
The copying of data between
SyteLine
sites
Site
Logically, any place where work is done. Thus, a site
can correspond to company headquarters, a manufacturing plant, a distribution
center, or a legal company that requires financial reporting. Even if all of
these facilities share a single physical building, each can be considered a
logical site.
Synchronous replication
Another term sometimes used for transactional
replication
Token
Allows one user login for a specified license module, under Named User
or Concurrent User licensing.
Transactional replication
A live constant connection from one site to another.
SyteLine replicates
the transaction to the remote site as soon as the user at one site saves
changes. It assumes that both the source and target sites are always connected
through SQL Server and have the same schema.
Trigger
A special class of stored procedure defined to
execute automatically when an UPDATE, INSERT, or DELETE statement is issued
against a database table or view. Sites use triggers to enforce business rules
automatically when data is modified.
View
A mechanism for gathering elements from SQL tables
and assembling them into a virtual table. Generated views simplify database
queries by eliminating the need to understand the underlying structure of a
database. In
SyteLine, views can
be used with master sites, allowing other sites in the intranet to maintain
data at the master site.
Also refers to multiple
"views" (different data sets) available on
SyteLine forms
such as
Customer Inquiry and
Vendor Inquiry.
WIP
Work in process for a product or products in various
stages of completion throughout the plant, including all material from raw
material that has been released for initial processing up to completely
processed material awaiting final inspection and acceptance as finished
product. Many accounting systems also include the value of partially finished
stock and components in this category.