Single Level Current BOM Report

This report shows the first level of component material requirements for an item, as indicated in the current BOM for that item.

You can produce this report for a range of items and product codes. You can include the following in the report:

  • Material types of Material, Fixture, Tool and Other
  • Purchased, manufactured and/or transferred items
  • A, B and/or C code items
  • Stocked and/or non-stocked items
  • Item costs
  • Reference fields