Estimate Job Cost Detail Report

This report lists the estimate jobs and their estimated costs.

This report prints in order by estimate job number and contains the labor, material, machine, or all planned cost information. The report displays the total cost of a material (the sum of material, labor, fixed overhead, variable overhead, and outside costs) in the Cost field.

Where applicable, this report prints the prospect number and name instead of the customer number and name.