Outside (Labor) Costs

(Outside Work Centers do not have Overhead Rates.)

The calculated value for the outside labor cost displays. The field is calculated as follows:

(WCSR * JRSH) + (WCRR * JRRH) = OC

  • OC = outside costs
  • WCSR = work center setup rate
  • JRSH = job route setup hours
  • WCRR = work center run rate
  • JRRH = job route run hours