Labor, Material, or Both
On the Copy Routing/BOM form, select one of the following:
- Labor: Copies only the labor portion of the routing
- Material: Copies only the material portion of the bill of material
- Both: Copies both the labor and material.
On the Job Operation Status Report form, select Labor to print setup and run hours or Material to print the material requirements and issues or Both to print both.
Note: The heading for column seven of the terminal
display Job Operation/Material Status report can be either: Run Labor
Hours per Piece or Run Pieces per Labor Hour. If you entered a value in
the Labor Hours per Piece field on the
Job Operations form, the column heading
will display as Run Labor Hours per Piece. If you entered a value in the
Pieces per Labor Hour field, the column
heading will display as Run Pieces per Labor Hour.