Event Type

The possible event types with their descriptions are:

  • Use Inventory: Existing inventory was used to satisfy an item requirement.
  • Use Supply: An existing (firm) supply was used to satisfy an item requirement.
  • Transfer Supply: A transfer order supply was received. This event only occurs with global APS planning.
  • Supply: A firm supply was received.
  • Planned Manufacture: Manufacture of a component item is planned to be completed.
  • Planned Purchase: A purchased item receipt is planned.
  • Use Infinite Item: A requirement is being met by using an infinite item; a purchased item with zero leadtime.
  • By-Product Supply: Supply of an item has been received due to it being a by-product in a BOM.
  • Use Planned Manufacture: A requirement is being met by using planned manufacture of an item.
  • Use MPS Item: A requirement is being met by using an MPS item supply.
  • Use MRP Item: A requirement is being met by using an MRP item supply.