Ending Time

This field applies to APS, MRP, and the Scheduler.

Enter the ending time for this shift interval in 24-hour format (that is, enter 2:00 p.m. as 14:00). For example, if you have a 5-day shift that ends at 2:00 p.m. each day, the Ending Time for each shift interval should be 14:00.

Note:  If your shift contains a break period (such as lunch), you can account for the break by subtracting that time from the end of the shift interval. For example, if the shift runs 06:00-15:00 and includes a 1-hour lunch, define the Ending Time for the shift as 14:00.