Check Effectivity Dates

Select this field if you do not want material included in the report unless its effective date falls between the Effective Date and Obsolete Date. Leave this field blank if you want all materials to print.

If you are running the Item Current Routing by Revision Report and you want the system to check the dates on which the ECN became effective, select this field.