Category

From

Select the code to specify the source of the copy for the routing and the bill of material (BOM):

  • Job: To copy the setup and run hours shown on the Standards tab on the Job Operations form and the material quantities and material costs shown on the Materials tab on the Job Materials form.
  • Current: To copy the item current routing and BOM from the Items form.
  • Actual Job: To copy the actual, posted setup and run hours and actual material quantities and costs from the job. These values were posted through job transactions after the job was run; they are shown on the Accum Values tab on the Job Operations and Job Materials forms.
  • Estimate Job: To copy the routing and BOM from an estimate job.
  • PS Item: To copy the routing and BOM from a production schedule item. PS Release to copy the routing and BOM from a production schedule release.
  • Alternate: To copy the routing and BOM from a BOM alternate ID.
Note:  It is possible to have several routings and BOMs for the same item. You could have a routing and BOM for a Current Standard, a Production Schedule, and a Job that were each unique, but all for the same item. This allows for flexibility or, for example, for any differences when manufacturing an item as a Job or as a Production Schedule.

To

Select the code to specify the target of the copy for the routing and the bill of material (BOM):

  • Job: To copy the routing and BOM to a Job.
  • Current: To copy the routing and BOM to the item current routing of the target item.
  • Estimate Job: To copy the routing and BOM to an Estimate Job.
  • PS Item: To copy the routing and BOM to a production schedule item.
  • PS Release: To copy the routing and BOM to a production schedule release. The release you are copying to must exist, must have a status of Planned or Released, and you must not have posted any production schedule transactions against it.
  • Alternate: To copy the routing and BOM to a BOM alternate ID.

When the Job or Production Schedule has a status of Released, a message displays indicating that you are adding operations to a released Job or Production Schedule.