Operation Copy Button

Click this button to copy an operation selected in the left pane of the Engineering Workbench form and paste it to the right pane. Copying an operation also copies all of the materials on that operation. The copied operation and its associated materials will be pasted to a new operation in the right pane.

You cannot copy a parent item in the left pane to an operation in the right pane. You can, however, copy the parent item as a material to an operation using the Material Copy button.

Also see Copying Alternate Materials.

Note:  This button is disabled when (in the right pane) the Status for Production Schedule BOM view is Complete, or Status for Job BOM view or Estimate BOM view is Complete or History.