Switching from APS Mode to MRP Mode
This topic describes the steps you should perform when you have been running APS Planning and you want to switch to MRP Planning. The APS Planning function uses a Windows service and a special memory-resident service that should be closed before you run MRP Planning.
Note:
- These steps are recommended only if you are making a long-term change to MRP Planning. If you are planning to switch back and forth between the two modes, do not perform these steps.
- If, after performing the steps in this topic, you want to switch back to APS Planning, you must recreate and restart the planner server service as described in the Installation Guide .