Engineering Board Card Content
Each card on the Engineering
Board has key data tied to it, but not all key data is shown.
Current BOM
Top Assembly and Sub-Assembly Cards:
- Line 1: Current, <blank>
- Line 2: Item number, Item Description
- Line 3: Revision
- Line 4: Lot Size, <blank>
Operation Cards:
- Line 1: Operation number, Work Code
- Line 2: Work Code Description
- Line 3: <blank>
- Line 4: <blank>
Material Cards:
- Line 1: Sequence number, Item Number
- Line 2: Item Description
- Line 3: Material Quantity, U/M, Units
- Line 4: <blank>
Job BOM
Top Assembly and Sub-Assembly Cards:
- Line 1: Status, Job and Suffix Number
- Line 2: Item number, Item Description
- Line 3: Revision
- Line 4: Quantity Released, Start Date - End Date
Operation Cards:
- Line 1: Operation number, WC
- Line 2: WC Description
- Line 3: Start Date - End Date
- Line 4: <blank>
Material Cards:
- Line 1: Sequence number, Item Number
- Line 2: Item Description
- Line 3: Material Quantity, U/M, Units
- Line 4: Quantity Required, Quantity Issued
Estimate Job BOM
Top Assembly and Sub-Assembly Cards:
- Line 1: Status, Job and Suffix Number
- Line 2: Item number, Item Description
- Line 3: Revision
- Line 4: Quantity Released, Start Date - End Date
Operation Cards:
- Line 1: Operation number, WC
- Line 2: WC Description
- Line 3: Start Date - End Date
- Line 4: <blank>
Material Cards:
- Line 1: Sequence number, Item Number
- Line 2: Item Description
- Line 3: Material Quantity, U/M, Units
- Line 4: <blank>
Special Indicators
Special indicators are displayed in red text when certain conditions exist for a card. These indicators might be displayed for a top assembly or sub-assembly card:
- Rev Tracked (for a job or estimate job, this is the item on the job)
- Phantom (current BOM only)
- Configurable (for a job or estimate job, this is the item on the job)
This indicator might be displayed for an operation card:
- Outside
These indicators might be displayed for a material card:
- Alternate
- Obsolete
- Picture