My Project Variances widget

View the counts of project variances (budgeted costs / actual costs) for active projects. Projects can be In Control (within the acceptable range), or have a Schedule Variance or Cost Variance. If the variance exceeds the lower deviation, the yellow symbol is displayed. If the variance exceeds the higher deviation, a red symbol is displayed.

Filter: Select a project type (My Projects or All Projects). If you click the link on a variance category, that category and the project type are used as filters for the Project Lookup widget.

Drillback: Projects, filtered on active projects with a variance that matches the selected area.