Shipped After Due Date

This display-only field shows the number of days after the due date that the order shipped.

For example, if an order was scheduled to ship on May 18, but it actually shipped on May 24, this field displays 6.

If the Last Ship Date is after the Due Date, then this value is calculated by subtracting the Due Date from the Last Ship Date. Otherwise, this field displays a zero (0).