Get Projected Date Button

Click this button to display in the Projected Date field the time required to manufacture this item at a selected site. External supply or manufacturer time is not considered.

This button is enabled when all of the following are true:

  • APS is configured and enabled
  • An item is specified
  • A site/warehouse is selected in the grid.