Get Projected Date Button
Click this button to display in the Projected Date field the time required to manufacture this item at a selected site. External supply or manufacturer time is not considered.
This button is enabled when all of the following are true:
- APS is configured and enabled
- An item is specified
- A site/warehouse is selected in the grid.