Utilization

On the Resource Group Load Profile and Resource Group Utilization APS forms, this field displays the percentage of the on-shift hours the resources in the resource group were utilized (Total Load Hours / On-Shift Hours * 100).

On the Resource Load Profile and Resource Utilization forms, this field displays the percentage of the on-shift hours this resource was utilized (Total Load Hours / On-Shift Hours * 100).

For example, a value of 112.58 means the resource or resource group was 12.58% over-utilized within the time period represented by the interval.