Total Run Cost (Labor)

The labor run cost of the operation displays. Labor costs are posted via the job transaction.

Normally, the system calculates the labor cost from these values on the Unposted Job Transactions form:

Total Hours * Job Cost Rate

However, when backflushing labor, the labor cost is calculated using these values instead:

(Operation Setup Hours * WC Setup Rate) + (Operation Run Time per Piece * Quantity produced * WC Run Rate)