Schedule ID

Enter the production schedule ID number that has the corresponding item as a production schedule item. The production schedule must have a status of Released.

If there is only one released production schedule containing the entered item, then the default is that production schedule in this field. In the case where there are multiple released production schedules with the same item, then nothing will default.