Outside (Labor) Costs
(Outside Work Centers do not have Overhead Rates.)
The calculated value for the outside labor cost displays. The field is calculated as follows:
(WCSR * JRSH) + (WCRR * JRRH) = OC
- OC = outside costs
- WCSR = work center setup rate
- JRSH = job route setup hours
- WCRR = work center run rate
- JRRH = job route run hours