Out

Note:  You can define the PO Reschedule Tolerance Factor and Job Reschedule Tolerance Factor fields in the same manner as the fields on the Planning Parameters form. If you enter values in these fields, they will override the values set on the Planning Parameters form. This feature allows you to set unique parameters for all items with a given product code. If you leave these fields blank, the system will use the values set on the Planning Parameters form.

For APS planning, in the Out field, enter the number of days later than the current due date that the job needs to be rescheduled before the system generates the Cross Reference Special Receipt: Reschedule 99/99/99 exception message.

For MRP planning, in the Out field, enter the number of days later than the current due date that the job needs to be rescheduled before the system generates the Move Out Receipt exception message. For example, if the Out field is set to 9, and the job receipt is scheduled to be available 10 days after the demand is due, no exception message is generated; however, if the Out field were set to 10, the Move Out Receipt exception would be generated.