Move/Finish/Buffer Shift ID

This field applies to both the Planner and the Scheduler.

Enter the shift schedule to use when planning the Move, Finish, and Buffer times. If left blank, the APS Planner processing will be calculated using 24x7 availability. If a shift schedule is specified, the APS Planner (and Scheduler) will use the shift definition to determine the real-time needed to achieve the Move, Finish, and Buffer times.

Note:  This field is not accessible on the Planning Parameters form when the system is in MRP mode.