Engineering Change Notice Use for Estimate BOM/Routings

Select the specification for use of ECNs. Valid options are:

  • All: Changes to any CURRENT/JOB/ESTIMATE BOM must be performed through the use of ECNs.
  • Individual: Only those items with the Rev Track flag set to Y require the use of ECNs for any changes to CURRENT/JOB/ESTIMATE BOM.
  • Never: The use of ECNs is not required for any desired changes to the CURRENT/JOB/ESTIMATE BOM.