BOM Sequence

Enter the sequence which the current material should display on a material list or single-level bill of material. This field is optional. If you enter a value, the next time you add a material for the job or production schedule, the default will be that value plus 1.

The bill of material sequence number can be a useful mechanism for tracking and reporting on material. It is used on these reports:

  • Indented Current BOM Report
  • Single Level Current BOM Report
  • Estimate Job Indented BOM Report
  • Estimate Job Routing Report
  • Job BOM Report

On the BOM Import Builder form, this field displays the BOM sequence. You cannot update this field.