Changing the Cost Distribution for a Co-Product Mix

To change the cost distribution for a co-product mix:

  1. Open the Co-Product Mix Operations form.
  2. Select the co-product mix.
  3. Select the co-product mix operation you want to modify.
  4. Enter the cost distributions for the co-product items for that operation.
  5. Repeat Steps 3-4 for each additional co-product mix operation.
  6. Select Actions > Save.