VA Order Entry - Detail - Line Items overview
Function acronym: VAET
Use this page to view, edit, add, or delete lines belonging to the section that is selected on the Sections tab.
On this page you can enter or change information in these fields:
- Product
- Quantity Total
- Quantity Needed
- Unit
You can access additional options from the Line Items view:
Click Add VA Line window is displayed.
to add a new line. TheNote: You cannot add a line to a completed IN section. If you attempt to add a line to a completed IN section, this message is displayed:This Value Add Order/Section/Line Is Complete and Cannot Be processed
Select a line in the grid and click
to access information pertaining to cost and availability, to change the quantity shipped, or to cancel the line. This option is not available for specification (sp) sections.
These options are available when you select the
(…) menu:Choose this option to view labor rates and charge method information about a labor product. This option is active for external (EX), internal (IT), and inspection (IS) section labor product lines.
Choose this option to delete the selected VA order. You are prompted to confirm the deletion.
Choose this option to specify comments for the VA line.
Choose this option to select what serial or lot numbers to use. This option is active for inventory in (II), inventory comp (IN) and internal (IT) section lines.
Select one or multiple lines and choose this option to create a tie from the current VA section line to a purchase order, warehouse transfer, or another VA order to obtain sufficient product for the fabrication process. This option is only available for inventory in (II), external EX), and internal (IN) type line items. If you create a new VA order, another VA Order Entry session opens and you are placed in the Quick Entry window with a new VA number. You can drill down on the order to access the detail and specify the required information.
You can select multiple lines in VA Order Entry-Line Items and tie them to a single warehouse transfer (allowing sourcing of all the selected lines to a single warehouse transfer). If you select multiple lines after the line has already been tied to a warehouse transfer, and then return to the Sourcing window, you are not permitted to change the warehouse transfer tie to a different PO or Value Add tie. Also, if you select No Tie on the Sourcing window after the warehouse transfer is created, the tie is removed, although the lines on the warehouse transfer still exist, and must be manually removed. A message is displayed: The Order No Longer Tied to PO/WT/WO#; Manually Remove From PO/WT/WO (5976).
You can also select Back Ties option in Product Warehouse Description Setup is selected. You can click the button from the VA Order Entry-PO/WT Interface window to view the Back Ties sourcing window.
to create a back tie to an existing warehouse transfer tie on an IN section line. This can only be done for a fabrication warehouse where the- Mark As WIP
Choose this option to begin the action of moving part of an Internal Process (IT) or Inspection (IS) section from Pending to Work in Process.
- Line History
Choose this option to view the history of a line (dates and stage changes). This option is active for inventory comp (in) section lines.
Select this option to export the selected lines to an Excel spreadsheet.