Receiving components

The material received in the kit build department contains a work in process status.

  1. From the RF Work Center Main Menu, select Receive Inventory.
  2. Scan the stage-in location the material was moved to from the storage locations.
  3. If you are receiving by item, use the arrow keys to select a pallet. Scroll to the right to verify the lot number, if required.
  4. Verify the item and quantity, and then specify Yes.
  5. Scan the pallet that contains the material being received.
  6. Repeat steps as needed to receive components into the kit build department.
  7. Use the back button in the RF browser to return to the Work Center Main Menu.