Access the Load Groups page. For example:
/CpmOpenlink/LoadGroups?View=CT P
Openlink&Mode=Admin
-
Click the plus sign to add a new load group. A new row will be
added.
Note: There is no limit to the number of load groups. Each time the
user starts OpenLink and selects a load group, the period and year are
automatically set to the default period and year.
-
Specify these information:
Option |
Description |
Load Group Name |
The name of the load group. You can specify up to 40
alphanumeric characters.
|
AP View Name |
The view name for the Approval Process. This is required to
set up a group that respects the Approval Process. The view is used to get and
set the approval status. We recommend you use a copy of the Approval_Base view.
If status is needed for multiple versions, set up a load group with a separate
view for each version. Each view must have the appropriate off-grid schedule
line and version selected. |
Default Period |
The default period for the Period list. You must select
from the drop-down list. |
Default Year |
The default period for the Year list. You must select from
the drop-down list. |
Display Order |
The display order for the Load Group list. You can specify
any number to change the display order.
|
When defining a load
group for the Approval Process, leave the Default Period and Default Year
fields empty. If these fields are left empty, the current off-grid members for
period or year from the view specified by AP View Name are used as the default
workflow periods.