Adding Hyperlinks to a Visualizer Report
Use report-level drill maps to add a hyperlink to a report. Set a Hyperlink at the end of a drill path. For more about using a hyperlink in a drill path, see Report-Level Drill Paths and Hyperlinks.
To add a hyperlink without drilling to different attributes, create a drill path that contains a single node.
- From a Visualizer report, select ..
- In the Report-Level Drilling window, click .
- Enter the attribute on the right pane.
- Click .
-
In the text box, enter the URL using BQL syntax. For example, to use the value
of Products.Products in a Google search:
'http://www.google.com/search?q='+[Retail_Stores.Store_Name]
- In the Open In field, select whether to open the URL in a New Window or the Same Window as the report.
- Close the Report-Level Drilling window.
- Click .
- Test the report.